I had a productive evening today, managed to get the gearbox and left hand crankcase assembled. Again to fit the bearings in the crankcase I heated it to 100 degrees and popped the bearings into the freezer for about an hour. In preparation to fit the left hand case complete I cooled the left hand crank with some cooler blocks and compressed air . . . and yep the case just slid down to meet its partner.
No comments:
Post a Comment