Showing posts with label Gearbox. Show all posts
Showing posts with label Gearbox. Show all posts

Tuesday, 11 August 2020

Bottom End

In order to plan for the electric connection of the ignition system I have been building the bottom end to fit the "powerdynamo" ignition.

Sunday, 18 March 2012

Reunited

I had a productive evening today, managed to get the gearbox and left hand crankcase assembled. Again to fit the bearings in the crankcase I heated it to 100 degrees and popped the bearings into the freezer for about an hour. In preparation to fit the left hand case complete I cooled the left hand crank with some cooler blocks and compressed air . . . and yep the case just slid down to meet its partner.