Monday, 16 February 2015
Dog Bones
Measuring, Fabricating and Fitting of the
new links to connect Frame, Shock and
Swingarm. The links from the shock to
the frame are temporary until the engine
is fitted.
NEW LINKS ON THE LEFT,
ORIGINAL yzf-r125 ON THE RIGHT
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment