Monday, 16 February 2015

Dog Bones

Measuring, Fabricating and Fitting of the
new links to connect Frame, Shock and
Swingarm. The links from the shock to
the frame are temporary until the engine
is fitted.
NEW LINKS ON THE LEFT,
ORIGINAL yzf-r125 ON THE RIGHT



No comments:

Post a Comment