Friday 1 May 2015

Switches

Over the last couple of weeks i have been working
mostly in the garden with a bit here and there in the
garage working on the front end of the project.
Both RD250 original handlebar switches have been
stripped cleaned, sprayed and assembled with stainless
screws/bolts and the wires re-covered with fresh heat shrink.

A bracket has been fabricated from 3mm aluminium bar
and fixed to the brake lever assembly.

I have also sprayed the clock backs and bracket along with
the headlight brackets, more on that to follow later.


No comments:

Post a Comment